Thursday, 10 March 2011
Pictures
I've just printed the pictures of the 'guy' and the girl he cheats on the artist with. I got these from his Facebook account and he has given us permission to use them. So we have definitely got these. I am currently getting everything ready for our filming in a bit.
Filming for Interrogation Scene
We will definitely be able to film tomorrow as I have contacted Jack (actor playing the 'guy') and he will be able to make our required time. I will get ready during period one and set the scene so we are ready to start filming at our chosen time. Therefore, we should be able to film all of our interrogation scene in the 2 hours! (and lunch if needed)
Wednesday, 9 March 2011
Filming List for Verse 1
Date to film: Friday 11th March 2011
Time: 09:50am - 11:10am
People needed: ALL OF GROUP plus Jack
Location: Under the stairs (interrogation room)
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Table
Time: 09:50am - 11:10am
People needed: ALL OF GROUP plus Jack
Location: Under the stairs (interrogation room)
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Table
- Lamp- Fan + extension cord
- Pictures of Jack with other girl
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- Shot of back of hair walking down stairs
- Shot of spinning chair
- Shots of throwing pictures on table
- Low angle shot of artist (Jack's POV)
- Extra shots incase extra footage is needed
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- Shot of back of hair walking down stairs
- Shot of spinning chair
- Shots of throwing pictures on table
- Low angle shot of artist (Jack's POV)
- Extra shots incase extra footage is needed
Tuesday, 8 March 2011
Change in filming plan:
The group has decided to change the filming day to Friday 11th instead of Thursday 10th. This is because for the section that we want to film of the music video, it needs to be filmed with the "guy" in the plot, therefore, we have to wait until Friday so that he is able to be on the shoot location with us as he will be available.
As a result the group have done another filming plan for the video shoot of Friday.
As a result the group have done another filming plan for the video shoot of Friday.
Planning of filming:
We have been unable to film recently due to unavailable time and people that we need. Therefore, we have made sure that we begin to start filming the majority of the video this week, more specifically, this thursday.
Location: In school, drama studios or/and underneath stairs (Dungeon)
Date: Thursday 10th March
Time: 15:30 to when filming is completed
Props: Camera, Camera tripod, Sweets, Clothes for the artist, Ipod, Ipod speakers, extension cables, a table, chairs
Shots:
- Close up shots
- Medium shots
- Low angle shots/High angle shots
- Tracking shots
What will be filmed:
We plan to film all the sections that needs the main "guy" of the video, such as under the stairs more and if we get time, we will also film the line up of lots of other guys in the drama studio. It all depends whether or not we can get the extra actors.
Location: In school, drama studios or/and underneath stairs (Dungeon)
Date: Thursday 10th March
Time: 15:30 to when filming is completed
Props: Camera, Camera tripod, Sweets, Clothes for the artist, Ipod, Ipod speakers, extension cables, a table, chairs
Shots:
- Close up shots
- Medium shots
- Low angle shots/High angle shots
- Tracking shots
What will be filmed:
We plan to film all the sections that needs the main "guy" of the video, such as under the stairs more and if we get time, we will also film the line up of lots of other guys in the drama studio. It all depends whether or not we can get the extra actors.
Thursday, 3 March 2011
Update:
The group has been updating and editing our current footage of what we have filmed so far for our music video. It seems that we are still missing main sections of the video, but we plan to get it done through filming next week sometime.
Yesterday and today, we have been focusing on editing the footage, the beginning, the end, the bridge and one of the chorus's for the video. We have been making sure that the cuts are quick and accurate so that it links into the same rhythm of the music from the song. For the beginning of the video, to link to the fast beats of the music, we have implemented different jump shots of the artist to give a disorientating feel.
Editing can not be completed before we finished all the filming and we intend on adding effects to the footage.
Yesterday and today, we have been focusing on editing the footage, the beginning, the end, the bridge and one of the chorus's for the video. We have been making sure that the cuts are quick and accurate so that it links into the same rhythm of the music from the song. For the beginning of the video, to link to the fast beats of the music, we have implemented different jump shots of the artist to give a disorientating feel.
Editing can not be completed before we finished all the filming and we intend on adding effects to the footage.
Wednesday, 2 March 2011
How We Keep In Touch
When we are not at school, we have found that a good way to keep in contact with each other is by texting so we text regularly to make sure we are on schedule and to remind each other of when we need to film and what we need to film.
Subscribe to:
Posts (Atom)
