We will be re doing the chorus as people thought that our costumes were repetitive in the video and also that the curtain behind wasn't very professional. This can be filmed tomorrow period 1 as that is the only time it is free.
Date to film: Friday 1st April
Time: 8:50am - 9:50am
People needed: ALL OF GROUP (no extras)
Location: Drama room (booked)
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (heels and RED flower for hair)
- Stage (this is portable, not using the main stage as it's too big)
- Mic stand + Mic (I'll get this from music dept.)
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Singing to audience
- Pan shot
- Shot of 'rocking out'
- Shots of walking around stage whilst singing
- Extra shots incase extra footage is needed
Showing posts with label Camera Work. Show all posts
Showing posts with label Camera Work. Show all posts
Thursday, 31 March 2011
Filming: Extra shots for second verse
After editing this section, I found that we needed many more shots for this section as it was not fully complete. Therefore, the group has decided to film extra shots for this section
Date: Monday 4th April
Location: French corridors, the white wall
Time: 13:00 to 14:00
People: All of the group/ Jack, Jamie and Michael
Shots:
- Artist walking around Jack and lip - syncing
- Shot of artist walking back to actors
- Jack/Gaga shot
- Artist doing "roar" to the song better
Date: Monday 4th April
Location: French corridors, the white wall
Time: 13:00 to 14:00
People: All of the group/ Jack, Jamie and Michael
Shots:
- Artist walking around Jack and lip - syncing
- Shot of artist walking back to actors
- Jack/Gaga shot
- Artist doing "roar" to the song better
Filming: Re shooting beginning
The group is deciding to re shoot the beginning of the video with the artist walking into the dungeon tomorrow. This is because we have shot that section in different sections, which as a result, the lighting is considerably different:
Date: Friday 1st April
Location: Under school stairs (dungeon)
Time: 10:00 to 11:00
People: All of the group (no extras needed)
Shots needed:
- Medium shot of the artist lip - syncing
- Back of the artist walking down stairs
- Tracking shot of artist from the side
- Quick shots of the artist "preparing" herself - (make up, shoes, clothing)
REMEMBER: Hair accessory needs to be on the right side and her hair needs to be up!!
Date: Friday 1st April
Location: Under school stairs (dungeon)
Time: 10:00 to 11:00
People: All of the group (no extras needed)
Shots needed:
- Medium shot of the artist lip - syncing
- Back of the artist walking down stairs
- Tracking shot of artist from the side
- Quick shots of the artist "preparing" herself - (make up, shoes, clothing)
REMEMBER: Hair accessory needs to be on the right side and her hair needs to be up!!
Filming: shots for the montage
We are still deciding when to film the last bit of the video with the "guy" being kicked out the door
We have decided to do a montage of shots, specifically with the artist and the "guy, reflecting their past before the problem. We plan to film this tomorrow:
Date: Friday 1st April
Location: Field/around the school
Time: 9:45 to 10:45
People: All of the group and Jack
Shots:
- Close up shots
- Medium shots
- Far shot/talking to each other
- Holding hands
We will also implement shots from other sections, such as the chorus, the "dungeon", the line up, the shots in the field etc we will make sure that the artist is singing in all sections so that when we come to editing, we will have a variety to choose from
Thursday, 24 March 2011
New filming date:
With problems regarding location and extra actors, we have decided that we will definitely film next time, during lesson time. We have decided that by doing filming in lesson time, we can take people from our lesson to star as the extra people will be available. Also, the corridor which will be the new location of the second verse and will be empty as it is lesson time.
Therefore, filming will take place the coming Monday:
When: Monday 28th March
Location: French corridors, long white wall
Time: 1:10pm to 2:00 (preparation will take place during the lunch time before this)
Props:
-Actors
-chair
- black paper strips
- blue tack
- camera
- tripod
- phone (with song on it)
Shots:
- P.O.V shot from artist to guys
- Tracking shot of the men in line
- Medium shot of artist walking through doors
- Close up shot of artists face/actors face
- Very low angle shot from "guy" p.o.v
Therefore, filming will take place the coming Monday:
When: Monday 28th March
Location: French corridors, long white wall
Time: 1:10pm to 2:00 (preparation will take place during the lunch time before this)
Props:
-Actors
-chair
- black paper strips
- blue tack
- camera
- tripod
- phone (with song on it)
Shots:
- P.O.V shot from artist to guys
- Tracking shot of the men in line
- Medium shot of artist walking through doors
- Close up shot of artists face/actors face
- Very low angle shot from "guy" p.o.v
Friday, 11 March 2011
Filming List for Narrative #2
Date to film: Wednesday 16th March 2011 (POSTPONED TO THURSDAY 24TH MARCH)
Time: 3:25pm - 6pm
People needed: ALL OF GROUP plus Jack, and 3 other boys
Location: Line up in drama room
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Black paper into strips
Time: 3:25pm - 6pm
People needed: ALL OF GROUP plus Jack, and 3 other boys
Location: Line up in drama room
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Black paper into strips
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- POV shot in front of each boy
- Shot of spinning chair
- Extra shots incase extra footage is needed
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- POV shot in front of each boy
- Shot of spinning chair
- Extra shots incase extra footage is needed
Wednesday, 9 March 2011
Filming List for Verse 1
Date to film: Friday 11th March 2011
Time: 09:50am - 11:10am
People needed: ALL OF GROUP plus Jack
Location: Under the stairs (interrogation room)
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Table
Time: 09:50am - 11:10am
People needed: ALL OF GROUP plus Jack
Location: Under the stairs (interrogation room)
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (biker boots and PINK flower for hair)
- Table
- Lamp- Fan + extension cord
- Pictures of Jack with other girl
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- Shot of back of hair walking down stairs
- Shot of spinning chair
- Shots of throwing pictures on table
- Low angle shot of artist (Jack's POV)
- Extra shots incase extra footage is needed
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Acting, but not singing
- Pan shot
- Shot of back of hair walking down stairs
- Shot of spinning chair
- Shots of throwing pictures on table
- Low angle shot of artist (Jack's POV)
- Extra shots incase extra footage is needed
Sunday, 6 February 2011
Filming List for Chorus
Date to film: Monday 7th February
Time: 3:25pm onwards...
People needed: ALL OF GROUP
Location: Should be drama room but I have found that it will be busy but we need to get on with filming so I've found that the hall is open for us and just as good.
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (heels and RED flower for hair)
- Stage (this is portable, not using the main stage as it's too big)
- Mic stand + Mic (I'll get this from music dept.)
- Fan + extension cord
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Singing to audience
- Pan shot
- Shot of 'rocking out'
- Shot of laying on floor singing
- Shots of walking around stage whilst singing
- Shots of coming out of the curtain
- Extra shots incase extra footage is needed
Time: 3:25pm onwards...
People needed: ALL OF GROUP
Location: Should be drama room but I have found that it will be busy but we need to get on with filming so I've found that the hall is open for us and just as good.
Props/Items we need to take:
- Video Camera
- Tape for camera
- iPod (make sure it's charged)
- iPod dock
- Costume! (heels and RED flower for hair)
- Stage (this is portable, not using the main stage as it's too big)
- Mic stand + Mic (I'll get this from music dept.)
- Fan + extension cord
Shots to be filmed:
- Close up
- Medium shot
- Wide shot
- Singing to camera
- Singing to audience
- Pan shot
- Shot of 'rocking out'
- Shot of laying on floor singing
- Shots of walking around stage whilst singing
- Shots of coming out of the curtain
- Extra shots incase extra footage is needed
Wednesday, 2 February 2011
Filming List for Bridge
Date to film: Thursday 3rd February
Time: 2:25pm onwards...
People needed: ALL OF GROUP
Location: I found that drama rooms were busy so I've booked the hall so we can use the back stage which is similar to our old location.
Shots to be filmed:
- Intimate close ups with the camera
- Semi-circle dolly
- Medium shot of singing to camera
- Shot of spinning (to insert in bits of the video)
- Close up from the right
- Singing whilst half dancing
- Extra shots incase extra footage is needed
Time: 2:25pm onwards...
People needed: ALL OF GROUP
Location: I found that drama rooms were busy so I've booked the hall so we can use the back stage which is similar to our old location.
Props/Items we need to take:
- Costume (rock n roll shirt)
- Fan + extension cord
- Video camera
- Tripod
- iPod (make sure it's charged!)
- iPod dock
- Tape for camera
Shots to be filmed:
- Intimate close ups with the camera
- Semi-circle dolly
- Medium shot of singing to camera
- Shot of spinning (to insert in bits of the video)
- Close up from the right
- Singing whilst half dancing
- Extra shots incase extra footage is needed
Monday, 13 December 2010
Meeting: Storyboard
We are currently having a meeting about our storyboard and how we are planning to start it. We are not sure on how we should begin the video as there are so many different, effective ways to portray the artist. We can not decide whether to start the video with a tracking shot of the artists feet or a point of view shot following the artist whilst breaking the 180 degree rule.
We finally decided to do the point of view shot following the artist whilst breaking the 180 degree rule. This was because of the image and persona that we wanted to create about the artist such as her being ruthless and doing as she pleases, linking to the idea of her breaking the 180 degree rule.
We finally decided to do the point of view shot following the artist whilst breaking the 180 degree rule. This was because of the image and persona that we wanted to create about the artist such as her being ruthless and doing as she pleases, linking to the idea of her breaking the 180 degree rule.
Subscribe to:
Posts (Atom)